The schedule has a baseline… and progress has evidence from site

Work breakdown, baseline, schedule, progress and site evidence: diaries, RFIs and quality checks.

There is no real screenshot of this area yet; the diagrams on this page explain the process only, and the screens are shown in a demo session per edition and scope.

A building under construction with each floor at a different project stage
  1. Work breakdownWork packages
  2. BaselineMeasurement reference
  3. Record on siteEvidence of work done
  4. Quality checkWork accepted for measurement
  5. Progress reviewVariance from baseline
Process diagram — not a system screen
Shown in a demo
Described in the company profile, shown in a demo session per edition.
Depends on scope
Depends on set-up, an integration or a service defined in scope.

Adapted from the DIGIT Corporate Profile 2026, page 21, 22, 23

A project is more than a Gantt chart

The schedule tells you what should happen; site evidence tells you what did happen. The difference is what needs a decision.

  1. 01

    Work breakdown

    The project broken into work packages linked to lines and cost.

  2. 02

    An approved baseline

    A fixed reference that progress is measured against, with its revisions recorded.

  3. 03

    Site evidence

    Diaries, RFIs and quality checks linked to the activity.

From plan to accepted progress

The planning and follow-up cycle as it moves between office and site.

  1. Step 1:

    Work breakdown

    Record
    WBS
    Owner
    Project planner
    State
    Approved
    Output
    Work packages
  2. Step 2:

    Baseline

    Record
    Approved schedule
    Owner
    Project manager
    State
    Locked
    Output
    Measurement reference
  3. Step 3:

    Record on site

    Record
    Site diary and RFI
    Owner
    Site engineer
    State
    Recorded
    Output
    Evidence of work done
  4. Step 4:

    Quality check

    Record
    QA/QC
    Owner
    Quality engineer
    State
    Accepted or rejected
    Output
    Work accepted for measurement
  5. Step 5:

    Progress review

    Record
    Progress update
    Owner
    Project manager
    State
    Reviewed
    Output
    Variance from baseline

Work rejected in a quality check does not count as progress and is not measured.

Planning and site records

What links the office to what happens on site.

  • Work breakdown structure

    WBS

    Work packages and their owners.

    Shown in a demo
  • Schedule and dependencies

    Gantt · Dependencies

    Activities, their sequence and the baseline.

    Shown in a demo
  • Site diary

    Site Diary

    Daily labour, equipment, weather and notes.

    Shown in a demo
  • Request for information

    RFI

    The technical question, who answers and by when.

    Shown in a demo
  • Quality inspection

    QA/QC

    The inspection result and what is needed to redo it.

    Shown in a demo

What the project manager decides

Decisions are built on the gap between plan and evidence.

  1. Which activities are slipping against the baseline?

    Late activities with their effect on dependencies.

    Source
    Schedule and progress updates
    Decided by
    Project manager
  2. What is holding up work on site?

    Open RFIs and rejected quality checks.

    Source
    RFI and QA/QC register
    Decided by
    Site engineer
  3. Do we approve a baseline revision?

    The revision compared with the current baseline, its reason and the linked change order.

    Source
    Baseline revisions
    Decided by
    Project director

Follow-up views

What is reviewed in the progress meeting.

  • Progress against baseline

    Planned, done and variance for each work package.

    Shown in a demo
  • RFI register

    Open, overdue and who is waiting for the answer.

    Shown in a demo
  • Quality results

    Accepted and rejected checks and rework.

    Shown in a demo

Depending on scope

What is agreed before implementation.

  • Mobile site recording

    Depends on scope

    How site recording works and who may do it is set during configuration.

  • Import from scheduling tools

    Depends on scope

    A separate integration scope with acceptance criteria.

Next step

See this process on a scenario close to your work

A short discovery session to define what your company needs, then we show the screens available in your edition and explain what needs set-up.

DIGIT · Our customers

Success stories

More than 50 Saudi businesses across contracting, real estate, trading, services and training chose Digit.

  • B
  • NS
  • Aramys
  • Missions
  • Fursan Al Nama Co.
  • SESE
  • Abdul-Aziz H. Al Sheikh Contracting Est.
  • INCA
  • Midad Al Ofoq Co. Ltd
  • Double Impact Trading
  • Tatweer
  • LCCC
  • Sa'b Transportation
  • SmartWay
  • Alhomaidhi
  • Water Tech. Sys.
  • Sahem Al-Oula Real Estate Co.
  • Falcon Security System
  • IMS Trading
  • Basic Fitness
  • Telal Sitta Invest Co.
  • Tashyeed for Contracting
  • CosmaCare Cosmetics Manufacturing
  • Mustaqbal Al Tatawor Logistics
  • Ensan Academy
  • Techno Seal
  • AlRaneem Catering Services
  • CBL City Building Leaders
  • Dr. Tom Clinic
  • MovePay
  • 1000 Fikra Real Estate
  • LOFT rest. & café
  • Kayes Contracting
  • ATC Al-Khaleej Training Center
  • Masar

DIGIT · Planning & Project Execution

A demo built around your needs

Contact on WhatsApp

Discuss your business needs with Digit

Enter a valid email or mobile number.